2018
Health & Aged Care
Pupovac Constructions
The Greenhill Manor Aged Care Facility Stage 2 upgrade consisted of two purpose built wings. The installation included VRF heat recovery systems, cassette units, ducted air conditioning systems, supply air and exhaust ventilation. A new Mechanical services switchboard was installed as well as connection to the existing central controller.