Commercial Air Conditioning Upgrade - Fleet Air Arm Museum

  • FleetAirArm
  • Fleet Museum Package Unit
  • Crane Lower Package Unit
  • Crane Fleet Air Arm

Project Overview

The air conditioning upgrade and refurbishment of the Fleet Air Arm Museum in Nowra includes the design, removal and installation of the existing air conditioning systems.  A range of new systems where installed ranging from the Split Wall Systems to Package Units.  Climax will also upgrade all the associated pipework, duct transitions and control work.  The project aimed for completion by the end of November 2020.

You can find out more about the Museum at www.navy.gov.au/heritage/museums/fleet-air-arm-museum

 

 

Project details

  • Year:: 2020
  • Work:: Design and Construct
  • Builder:: Direct