Uniting Care Mayflower Village

  • Mayflower Internal
  • Mayflower Bedroom2
  • Mayflower Sheetmetal Climax Air Conditioning
  • Mayflower Sheetmetal Climax Air Conditioning
  • Mayflower Pipework 2 Climax Air
  • Mayflower Pipework Climax Air
  • uniting-care-mayflower-village

Project Overview

Climax Air Conditioning provided this project with the design and construction of 20 x VRF Air Conditioning systems, Mechanical Ventilation, BMS. Plus, Freezer Room and Cool Room refrigeration systems, including all associated controls and pipe work.

The 100 Bed Aged Care Facility is a mixture of 75 single rooms, 10 double rooms and 5 accessible rooms over 5 households from ground to L2.  Each household has 20 beds and shares clinical BOH, community kitchen, dining lounge and sitting rooms along with outside access via balconies or courtyard.

 

Images courtesy of Richard Crookes Constructions https://richardcrookes.com.au/project/uniting-gerringong/

Project details

  • Year: 2017-2018
  • Work: Design & Construct
  • Builder: Richard Crookes Constructions